BY KEYWORD BY STATE BY MANUFACTURER
NEW VISITOR?  Start Here ADVANCED SEARCH
Search Search

5094 - Demil Q Powered & Non-Powered Causeways & Warping Tugs @ Coronado, CA & Jacksonville, FL


Click for Event Information & Bid Package View Event Info, Bid Package, Maps
This is a list of all lots in event 5094.
Dollar amounts shown may not reflect up to the minute bid pricing. Click on individual lot titles for current bid price, as well as additional lot information.
  Excel Report Click for Excel Spreadsheet
View Today's Closing Events / Lots
Current Lots
Displaying 1 - 9 of 9 Total Lots.   Check / Uncheck All
  Click to add selected lots to your Watchlist
< < Previous   |  |  Next > >   To re-sort the page, click on
a column heading below.
Event  Lot Sort by Lot Number  Lot Title Qty.  Lot Price  Location    Opening  Closing
5094
6500 
1995, NAVAL FACILITIES ENGINEERING COMMAND POWERED CAUSEWAY/ BARGE SECTION CRAFT. HULL CSP 94181, CHARACTERISTICS: THIS BID IS FOR ONE CAUSEWAY WHICH IS ASSEMBLED WITH APPROX (33) INDIVIDUAL CUBICLE PONTOONS 5'X5'X7', (2)EA POWERED MODULES AND (1) EA MACHINERY COMPARTMENT 25'X7'5', WEIGHT APPROX 200, 000 LBS. WIDTH 21' 6", DECK HEIGHT 5', TOTAL HEIGHT 13', LENGTH APPROX 90'. POWERED BY (2) EA DETROIT DIESEL ENGINES , ENGINE HOURS 189 AND 187. DRIVEN BY (2) EA ALLISON MARINE TRANSMISSIONS THAT TRANSFER POWER VIA (2) EA LARGE DRIVE SHAFTS TO (2) EA WATER PROPULSION ASSEMBLIES. CRAFT HAS A 55 GALLONS STAINLESS STEEL HYDRAULIC TANK WITH A HYDRAULIC STARTING AND STEERING SYSTEM. IT HAS A 625 APPROX GALS STAINLESS STEEL FUEL TANK AND ENGINE CAN BE RUN ON DIESEL FUELS. MOST FUEL/ HYD PIPING IS STAINLESS STEEL. ENGINES ARE OUTFITTED WITH SEA CHESTS AND SELECTOR VALVES FOR RAW WATER COOLING. THE FIRE SUPPRESSION SYSTEM HAS (3) EA 50# FIRE BOTTLES INSTALLED TO A PERMANENT PIPING SYSTEM. ELECTRICAL SYSTEM HAS (4) EA 12V BATTERIES INSTALLED. CRAFT IS OPERATED VIA THE PILOT HOUSE AND THE USE OF MORSE CABLE CONTROLS. EACH SPACE IS OUTFITTED WITH (2) EA BILGE PUMPS (FORWARD AND AFT). MACHINERY SPACE HAS (6) EA NITROGEN FILLED ACCUMULATORS THAT PROVIDE POWER AND ASSISTANCE TO THE HYDRAULIC SYSTEM. A LIGHT MAST IS INCLUDED. UNKNOWN CONDITION OF CAUSEWAY BOTTOM, EXPECT ENGINES TO BE IN GOOD SHAPE AND ABLE TO RUN. DIMENSIONS ARE APPROXIMATE AND DESCRIPTION IS DESCRIBED AS THROUGHLY AS POSSIBLE HOWEVER THE ACTUAL SPECIFICATIONS/ COMPONENTS MAY DIFFER FROM THE DESCRIPTION. IF REMOVED BY WATER BUYER IS ENTITLED FOR CRAFT TO BE MOVED FROM CURRENT LOCATION TO CRANE FREE OF CHARGE, HOWEVER BUYER IS RESPONSIBLE FOR CRANE CHARGES IN ORDER FOR CRAFT TO BE LAUNCHED INTO WATER. CUSTOMER IS ALLOWED TO CONDUCT CUTTING/ BRAZING PROVIDED THAT HE FOLLOWS ALL SAFETY AND ENVIRONMENTAL REQUIREMENTS AS REQUIRED BY THE BASE SAFETY/ ENVIRONMENTAL OFFICER, IF DISASSEMBLED IN SECTIONS BUYER IS ENTITLED TO ONE SECTION LIFT ONLY, BUYER IS RESPONSIBLE FOR LIFTING OF REMAINING SECTIONS AT HIS OWN EXPENSE. BIDDING IS ON ONE CAUSEWAY ASSEMBLY. CRAFT IS LOCATED AT MARINE DETACHMENT BLOUNT ISLAND.
... read more

Has a Photo Bidding Restrictions Apply Tax Forms for this State Get a Quote
 1   $      FL,
Jacksonville

PREVIEW INFO...
LOADOUT INFO...
 03/03/2010  
5094
6501 
1995, NAVAL FACILITIES ENGINEERING COMMAND POWERED CAUSEWAY/ BARGE SECTION CRAFT. HULL CSP 94174, CHARACTERISTICS: THIS BID IS FOR ONE CAUSEWAY WHICH IS ASSEMBLED WITH APPROX (33) INDIVIDUAL CUBICLE PONTOONS 5'X5'X7', (2)EA POWERED MODULES AND (1) EA MACHINERY COMPARTMENT 25'X5'7'. WEIGHT APPROX 200000 LBS. WIDTH 21' 6", DECK HEIGHT 5', TOTAL HEIGHT 13', LENGTH 90'. POWERED BY (2) EA DETROIT DIESEL ENGINES DD8V71T POWER 92, ENGINE HOURS 114 AND 115. DRIVEN BY (2) EA ALLISON MARINE TRANSMISSIONS THAT TRANSFER POWER VIA (2) EA LARGE DRIVE SHAFTS TO (2) EA WATER PROPULSION ASSEMBLIES. CRAFT HAS A 55 GALLONS STAINLESS STEEL HYDRAULIC TANK WITH A HYDRAULIC STARTING AND STEERING SYSTEM. IT HAS A 625 APPROX GALS STAINLESS STEEL FUEL TANK AND ENGINE CAN BE RUN ON DIESEL FUELS. MOST FUEL/ HYD PIPING IS STAINLESS STEEL. ENGINES ARE OUTFITTED WITH SEA CHESTS AND SELECTOR VALVES FOR RAW WATER COOLING. THE FIRE SUPPRESSION SYSTEM HAS (3) EA 50# FIRE BOTTLES INSTALLED TO A PERMANENT PIPING SYSTEM. ELECTRICAL SYSTEM HAS (4) EA 12V BATTERIES INSTALLED. CRAFT IS OPERATED VIA THE PILOT HOUSE AND THE USE OF MORSE CABLE CONTROLS. EACH SPACE IS OUTFITTED WITH (2) EA BILGE PUMPS (FORWARD AND AFT). MACHINERY SPACE HAS (6) EA NITROGEN FILLED ACCUMULATORS THAT PROVIDE POWER AND ASSISTANCE TO THE HYDRAULIC SYSTEM. A LIGHT MAST IS INCLUDED. UNKNOWN CONDITION OF CAUSEWAY BOTTOM, EXPECT ENGINES TO BE IN GOOD SHAPE AND ABLE TO RUN. DIMENSIONS ARE APPROXIMATE AND DESCRIPTION IS DESCRIBED AS THROUGHLY AS POSSIBLE HOWEVER THE ACTUAL SPECIFICATIONS/ COMPONENTS MAY DIFFER FROM THE DESCRIPTION. IF REMOVED BY WATER BUYER IS ENTITLED FOR CRAFT TO BE MOVED FROM CURRENT LOCATION TO CRANE FREE OF CHARGE, HOWEVER BUYER IS RESPONSIBLE FOR CRANE CHARGES IN ORDER FOR CRAFT TO BE LAUNCHED INTO WATER. CUSTOMER IS ALLOWED TO CONDUCT CUTTING/ BRAZING PROVIDED THAT HE FOLLOWS ALL SAFETY AND ENVIRONMENTAL REQUIREMENTS AS REQUIRED BY THE BASE SAFETY/ ENVIRONMENTAL OFFICER, IF DISASSEMBLED IN SECTIONS BUYER IS ENTITLED TO ONE SECTION LIFT ONLY, BUYER IS RESPONSIBLE FOR LIFTING OF REMAINING SECTIONS AT HIS OWN EXPENSE. BIDDING IS ON ONE CAUSEWAY ASSEMBLY. CRAFT IS LOCATED AT MARINE DETACHMENT BLOUNT ISLAND.
... read more

Has a Photo Bidding Restrictions Apply Tax Forms for this State Get a Quote
 1   $      FL,
Jacksonville

PREVIEW INFO...
LOADOUT INFO...
 03/03/2010  
5094
6502 
1995, NAVAL FACILITIES ENGINEERING COMMAND POWERED CAUSEWAY/ BARGE SECTION CRAFT. HULL CSP 94167, CHARACTERISTICS: THIS BID IS FOR ONE CAUSEWAY WHICH IS ASSEMBLED WITH APPROX (33) INDIVIDUAL CUBICLE PONTOONS 5'X5'X7', (2)EA POWERED MODULES AND (1) EA MACHINERY COMPARTMENT 25'X5'7'. WEIGHT APPROX 200000 LBS. WIDTH 21' 6", DECK HEIGHT 5', TOTAL HEIGHT 13', LENGTH 90' APPROX. POWERED BY (2) DETROIT DIESEL ENGINES DD8V71T POWER 92, ENGINE HOURS 415 AND 421. DRIVEN BY (2) EA ALLISON MARINE TRANSMISSIONS THAT TRANSFER POWER VIA (2) EA LARGE DRIVE SHAFTS TO (2) EA WATER PROPULSION ASSEMBLIES. CRAFT HAS A 55 GALLONS STAINLESS STEEL HYDRAULIC TANK WITH A HYDRAULIC STARTING AND STEERING SYSTEM. IT HAS A 625 APPROX GALS STAINLESS STEEL FUEL TANK AND ENGINE CAN BE RUN ON DIESEL FUELS. MOST FUEL/ HYD PIPING IS STAINLESS STEEL. ENGINES ARE OUTFITTED WITH SEA CHESTS AND SELECTOR VALVES FOR RAW WATER COOLING. THE FIRE SUPPRESSION SYSTEM HAS (3) EA 50# FIRE BOTTLES INSTALLED TO A PERMANENT PIPING SYSTEM. ELECTRICAL SYSTEM HAS (4) EA 12V BATTERIES INSTALLED. CRAFT IS OPERATED VIA THE PILOT HOUSE AND THE USE OF MORSE CABLE CONTROLS. EACH SPACE IS OUTFITTED WITH (2) EA BILGE PUMPS (FORWARD AND AFT). MACHINERY SPACE HAS (6) EA NITROGEN FILLED ACCUMULATORS THAT PROVIDE POWER AND ASSISTANCE TO THE HYDRAULIC SYSTEM. A LIGHT MAST IS INCLUDED. UNKNOWN CONDITION OF CAUSEWAY BOTTOM, EXPECT ENGINES TO BE IN GOOD SHAPE AND ABLE TO RUN. DIMENSIONS ARE APPROXIMATE AND DESCRIPTION IS DESCRIBED AS THROUGHLY AS POSSIBLE HOWEVER THE ACTUAL SPECIFICATIONS/ COMPONENTS MAY DIFFER FROM THE DESCRIPTION. IF REMOVED BY WATER BUYER IS ENTITLED FOR CRAFT TO BE MOVED FROM CURRENT LOCATION TO CRANE FREE OF CHARGE, HOWEVER BUYER IS RESPONSIBLE FOR CRANE CHARGES IN ORDER FOR CRAFT TO BE LAUNCHED INTO WATER. CUSTOMER IS ALLOWED TO CONDUCT CUTTING/ BRAZING PROVIDED THAT HE FOLLOWS ALL SAFETY AND ENVIRONMENTAL REQUIREMENTS AS REQUIRED BY THE BASE SAFETY/ ENVIRONMENTAL OFFICER, IF DISASSEMBLED IN SECTIONS BUYER IS ENTITLED TO ONE SECTION LIFT ONLY, BUYER IS RESPONSIBLE FOR LIFTING OF REMAINING SECTIONS AT HIS OWN EXPENSE. BIDDING IS ON ONE CAUSEWAY ASSEMBLY. CRAFT IS LOCATED AT MARINE DETACHMENT BLOUNT ISLAND.
... read more

Has a Photo Bidding Restrictions Apply Tax Forms for this State Get a Quote
 1   $      FL,
Jacksonville

PREVIEW INFO...
LOADOUT INFO...
 03/03/2010  
5094
6505 
NAVAL FACILITIES ENGINEERING COMMAND (SLWT) SIDE LOADABLE WARPING TUG, HULL SWT87039, CHARACTERISTICS: THIS BID IS FOR ONE WARPING TUG WHICH IS ASSEMBLED WITH APPROX (30) INDIVIDUAL CUBICLE PONTOONS 5'X5'X7', AND (2) POWERED MODULES AND (1) MACHINERY SPACE 25'X5'7 WEIGHT APPROX (200000 LBS, INCLUDES WINCH DOUBLE DRUM WITH CABLE, HOURS 13, A FRAME, MAST LIGHT ASSEMBLY, ANCHOR 2120 LBS WITHOUT CHAIN, WIDTH 21' 6", DECK HEIGHT 5', TOTAL HEIGHT 13', LENGTH 80' APPROX, POWERED BY (2)EA DETROIT DIESEL ENGINES, ENGINE HOURS 637 AND 789. DRIVEN BY (2)EA ALLISON TWIN DISC MARINE TRANSMISSIONS THAT TRANSFER POWER VIA (2)EA LARGE DRIVE SHAFTS TO (2)EA WATER PROPULSION ASSEMBLIES. CRAFT HAS A 55 GALLON STAINLESS STEEL HYDRAULIC TANK WITH A HYDRAULIC STARTING AND STEERING SYSTEM. IT HAS A 320 GALLON STAINLESS STEEL FUEL TANK AND ENGINE CAN BE RUN ON DIESEL FUELS. MOST FUEL/ HYD PIPING IS STAINLESS STEEL. ENGINES ARE OUTFITTED WITH SEA CHESTS AND SELECTOR VALVES FOR RAW WATER COOLING. THE FIRE SUPPRESSION SYSTEM HAS (3)EA 50# FIRE BOTTLES INSTALLED TO A PERMANENT PIPING SYSTEM. ELECTRICAL SYSTEM HAS (4)EA 12V BATTERIES INSTALLED. CRAFT IS OPERATED VIA THE PILOT HOUSE AND THE USE OF MORSE CABLE CONTROLS. EACH SPACE IS OUTFITTED WITH (2)EA BILGE PUMPS (FORWARD AND AFT). MACHINERY SPACE HAS (6)EA NITROGEN FILLED ACCUMULATORS THAT PROVIDE POWER AND ASSISTANCE TO THE HYDRAULIC SYSTEM. CRAFT HAS STORAGE PONTOONS. UNKNOWN CONDITION OF CAUSEWAY BOTTOM, EXPECT ENGINES TO BE IN GOOD SHAPE AND ABLE TO RUN. DIMENSIONS ARE APPROXIMATE AND DESCRIPTION IS DESCRIBED AS THROUGHLY AS POSSIBLE HOWEVER THE ACTUAL SPECIFICATIONS/ COMPONENTS MAY DIFFER FROM THE DESCRIPTION. IF REMOVED BY WATER BUYER IS ENTITLED FOR CRAFT TO BE MOVED FROM CURRENT LOCATION TO CRANE FREE OF CHARGE, HOWEVER BUYER IS RESPONSIBLE FOR CRANE CHARGES IN ORDER FOR CRAFT TO BE LAUNCHED INTO WATER. CUSTOMER IS ALLOWED TO CONDUCT CUTTING/ BRAZING PROVIDED THAT HE FOLLOWS ALL SAFETY AND ENVIRONMENTAL REQUIREMENTS AS REQUIRED BY THE BASE SAFETY/ ENVIRONMENTAL OFFICER, IF DISASSEMBLED IN SECTIONS BUYER IS ENTITLED TO ONE SECTION LIFT ONLY, BUYER IS RESPONSIBLE FOR LIFTING OF REMAINING SECTIONS AT HIS OWN EXPENSE. BIDDING IS ON ONE CAUSEWAY ASSEMBLY. CRAFT IS LOCATED AT MARINE DETACHMENT BLOUNT ISLAND.
... read more

Has a Photo Bidding Restrictions Apply Tax Forms for this State Get a Quote
 1   $      FL,
Jacksonville

PREVIEW INFO...
LOADOUT INFO...
 03/03/2010  
5094
6506 
NAVAL FACILITIES ENGINEERING COMMAND (SLWT) SIDE LOADABLE WARPING TUG, HULL SWT87047, CHARACTERISTICS: THIS BID IS FOR ONE WARPING TUG WHICH IS ASSEMBLED WITH APPROX (30)INDIVIDUAL CUBICLE PONTOONS 5'X5'X7', AND (2) POWERED MODULES (1) MACHINERY SPACE 25'X5'7'. WEIGHT APPROX 200000 LBS, INCLUDES WINCH DOUBLE DRUM WITH CABLE, HOURS 15, A FRAME, MAST LIGHT ASSEMBLY, ANCHOR 2120 LBS WITHOUT CHAIN, WIDTH 21' 6", DECK HEIGHT 5', TOTAL HEIGHT 13', LENGTH 80' APPROX. POWERED BY (2) DETROIT DIESEL ENGINES, ENGINE HOURS 502 AND 508. DRIVEN BY (2)EA ALLISON TWIN DISC MARINE TRANSMISSIONS THAT TRANSFER POWER VIA (2)EA LARGE DRIVE SHAFTS TO (2)EA WATER PROPULSION ASSEMBLIES. CRAFT HAS A 55 GALLON STAINLESS STEEL HYDRAULIC TANK WITH A HYDRAULIC STARTING AND STEERING SYSTEM. IT HAS A 320 GALLON STAINLESS STEEL FUEL TANK AND ENGINE CAN BE RUN ON DIESEL FUELS. MOST FUEL/ HYD PIPING IS STAINLESS STEEL. ENGINES ARE OUTFITTED WITH SEA CHESTS AND SELECTOR VALVES FOR RAW WATER COOLING. THE FIRE SUPPRESSION SYSTEM HAS (3)EA 50# FIRE BOTTLES INSTALLED TO A PERMANENT PIPING SYSTEM. ELECTRICAL SYSTEM HAS (4)EA 12V BATTERIES INSTALLED. CRAFT IS OPERATED VIA THE PILOT HOUSE AND THE USE OF MORSE CABLE CONTROLS. EACH SPACE IS OUTFITTED WITH (2)EA BILGE PUMPS (FORWARD AND AFT). MACHINERY SPACE HAS (6)EA NITROGEN FILLED ACCUMULATORS THAT PROVIDE POWER AND ASSISTANCE TO THE HYDRAULIC SYSTEM. CRAFT HAS STORAGE PONTOONS. UNKNOWN CONDITION OF CAUSEWAY BOTTOM, EXPECT ENGINES TO BE IN GOOD SHAPE AND ABLE TO RUN. DIMENSIONS ARE APPROXIMATE AND DESCRIPTION IS DESCRIBED AS THROUGHLY AS POSSIBLE HOWEVER THE ACTUAL SPECIFICATIONS/ COMPONENTS MAY DIFFER FROM THE DESCRIPTION. IF REMOVED BY WATER BUYER IS ENTITLED FOR CRAFT TO BE MOVED FROM CURRENT LOCATION TO CRANE FREE OF CHARGE, HOWEVER BUYER IS RESPONSIBLE FOR CRANE CHARGES IN ORDER FOR CRAFT TO BE LAUNCHED INTO WATER. CUSTOMER IS ALLOWED TO CONDUCT CUTTING/ BRAZING PROVIDED THAT HE FOLLOWS ALL SAFETY AND ENVIRONMENTAL REQUIREMENTS AS REQUIRED BY THE BASE SAFETY/ ENVIRONMENTAL OFFICER, IF DISASSEMBLED IN SECTIONS BUYER IS ENTITLED TO ONE SECTION LIFT ONLY, BUYER IS RESPONSIBLE FOR LIFTING OF REMAINING SECTIONS AT HIS OWN EXPENSE. BIDDING IS ON ONE CAUSEWAY ASSEMBLY. CRAFT IS LOCATED AT MARINE DETACHMENT BLOUNT ISLAND.
... read more

Has a Photo Bidding Restrictions Apply Tax Forms for this State Get a Quote
 1   $      FL,
Jacksonville

PREVIEW INFO...
LOADOUT INFO...
 03/03/2010  
5094
6507 
NAVAL FACILITIES ENGINEERING COMMAND (SLWT) SIDE LOADABLE WARPING TUG, HULL SWT 39054, CHARACTERISTICS: THIS BID IS FOR ONE WARPING TUG WHICH IS ASSEMBLED WITH APPROX (30) INDIVIDUAL CUBICLE PONTOONS 5'X5'X7', (2) POWERED MODULES (1) MACHINERY SPACE 25'X5'X7', WEIGHT APPROX 200000, INCLUDES WINCH DOUBLE DRUM WITH CABLE, HOURS 4, A FRAME, MAST LIGHT ASSEMBLY NOT INCLUDED, ANCHOR 2120 LBS WITHOUT CHAIN, WIDTH 21' 6", DECK HEIGHT 5', TOTAL HEIGHT 13', LENGTH 80'. POWERED BY (2)EA DETROIT DIESEL ENGINES, ENGINE HOURS 26 AND 51. DRIVEN BY (2)EA ALLISON TWIN DISC MARINE TRANSMISSIONS THAT TRANSFER POWER VIA (2)EA LARGE DRIVE SHAFTS TO (2)EA WATER PROPULSION ASSEMBLIES. CRAFT HAS A 55 GALLON STAINLESS STEEL HYDRAULIC TANK WITH A HYDRAULIC STARTING AND STEERING SYSTEM. IT HAS A 320 GALLON STAINLESS STEEL FUEL TANK AND ENGINE CAN BE RUN ON DIESEL FUELS. MOST FUEL/ HYD PIPING IS STAINLESS STEEL. ENGINES ARE OUTFITTED WITH SEA CHESTS AND SELECTOR VALVES FOR RAW WATER COOLING. THE FIRE SUPPRESSION SYSTEM HAS (3)EA 50# FIRE BOTTLES INSTALLED TO A PERMANENT PIPING SYSTEM. ELECTRICAL SYSTEM HAS (4)EA 12V BATTERIES INSTALLED. CRAFT IS OPERATED VIA THE PILOT HOUSE AND THE USE OF MORSE CABLE CONTROLS. EACH SPACE IS OUTFITTED WITH (2)EA BILGE PUMPS (FORWARD AND AFT). MACHINERY SPACE HAS (6)EA NITROGEN FILLED ACCUMULATORS THAT PROVIDE POWER AND ASSISTANCE TO THE HYDRAULIC SYSTEM. CRAFT HAS STORAGE PONTOONS. UNKNOWN CONDITION OF CAUSEWAY BOTTOM, EXPECT ENGINES TO BE IN GOOD SHAPE AND ABLE TO RUN. DIMENSIONS ARE APPROXIMATE AND DESCRIPTION IS DESCRIBED AS THROUGHLY AS POSSIBLE HOWEVER THE ACTUAL SPECIFICATIONS/ COMPONENTS MAY DIFFER FROM THE DESCRIPTION. IF REMOVED BY WATER BUYER IS ENTITLED FOR CRAFT TO BE MOVED FROM CURRENT LOCATION TO CRANE FREE OF CHARGE, HOWEVER BUYER IS RESPONSIBLE FOR CRANE CHARGES IN ORDER FOR CRAFT TO BE LAUNCHED INTO WATER. CUSTOMER IS ALLOWED TO CONDUCT CUTTING/ BRAZING PROVIDED THAT HE FOLLOWS ALL SAFETY AND ENVIRONMENTAL REQUIREMENTS AS REQUIRED BY THE BASE SAFETY/ ENVIRONMENTAL OFFICER, IF DISASSEMBLED IN SECTIONS BUYER IS ENTITLED TO ONE SECTION LIFT ONLY, BUYER IS RESPONSIBLE FOR LIFTING OF REMAINING SECTIONS AT HIS OWN EXPENSE. BIDDING IS ON ONE CAUSEWAY ASSEMBLY. CRAFT IS LOCATED AT MARINE DETACHMENT BLOUNT ISLAND.
... read more

Has a Photo Bidding Restrictions Apply Tax Forms for this State Get a Quote
 1   $      FL,
Jacksonville

PREVIEW INFO...
LOADOUT INFO...
 03/03/2010  
5094
6508 
CAUSEWAY SECTION ASSEMBLY, OFFSHORE NON-POWERED S/ N COS89-044, THIS BID IS FOR ONE NON POWERED CAUSEWAY (MIDDLE CAUSEWAY ONLY) WHICH IS ASSEMBLED WITH APPROX (42) INDIVIDUAL CUBICLE PONTOONS 5'X6'X7' PONTOONS:INCLUDE (36) CUBICLE IN SHAPE MAIN BODY PONTOONS, (3) STRAIGHT LINE SLOPING BOW PONTOONS, (3) SLOPED DECK PONTOONS, (3) RAMP END PONTOONS, (1) P-8 MALE PONTOON, 1 P-8 FEMALE PONTOON, 1 P1-H6 PONTOON ASSY, 5 R-1A RAMP, 10 PH-6 HINGED PAD EYES, CRAFT WEIGHT APPROX 150, 000 LBS. 90 FEET IN LENGTH BY 21 FEET WIDE. DIMENSIONS ARE APPROXIMATE AND DESCRIPTION IS DESCRIBED AS THROUGHLY AS POSSIBLE HOWEVER THE ACTUAL SPECIFICATIONS/ COMPONENTS MAY DIFFER FROM THE DESCRIPTION. IF REMOVED BY WATER BUYER IS ENTITLED FOR CRAFT TO BE MOVED FROM CURRENT LOCATION TO CRANE FREE OF CHARGE, HOWEVER BUYER IS RESPONSIBLE FOR CRANE CHARGES IN ORDER FOR CRAFT TO BE LAUNCHED INTO WATER. CUSTOMER IS ALLOWED TO CONDUCT CUTTING/ BRAZING PROVIDED THAT HE FOLLOWS ALL SAFETY AND ENVIRONMENTAL REQUIREMENTS AS REQUIRED BY THE BASE SAFETY/ ENVIRONMENTAL OFFICER, IF DISASSEMBLED IN SECTIONS BUYER IS ENTITLED TO ONE SECTION LIFT ONLY, BUYER IS RESPONSIBLE FOR LIFTING OF REMAINING SECTIONS AT HIS OWN EXPENSE. BIDDING IS ON ONE CAUSEWAY ASSY ONLY. CRAFT IS LOCATED AT MARINE DETACHMENT BLOUNT ISLAND.
... read more

Has a Photo Bidding Restrictions Apply Tax Forms for this State Get a Quote
 1   $      FL,
Jacksonville

PREVIEW INFO...
LOADOUT INFO...
 03/03/2010  
5094
6509 
CAUSEWAY SECTION ASSEMBLY, OFFSHORE NON-POWERED S/ N , THIS BID IS FOR ONE NON POWERED CAUSEWAY (TOP CAUSEWAY ONLY) WHICH IS ASSEMBLED WITH APPROX (42) INDIVIDUAL CUBICLE PONTOONS 5'X5'X7' PONTOONS: INCLUDES (36) CUBICLE IN SHAPE MAIN BODY PONTOONS, (3) STRAIGHT LINE SLOPING BOW PONTOONS, (3) SLOPED DECK PONTOONS, (3) RAMP END PONTOONS, (1) P-8 MALE PONTOON, (1) P-8 FEMALE PONTOON, (1) P1-H6 PONTOON ASSY, (5) R-1A RAMP, (10) PH-6 HINGED PAD EYES, CRAFT WEIGHT APPROX 150, 000 LBS. 90 FEET IN LENGTH BY 21 FEET WIDE DIMENSIONS ARE APPROXIMATE AND DESCRIPTION IS DESCRIBED AS THROUGHLY AS POSSIBLE HOWEVER THE ACTUAL SPECIFICATIONS/ COMPONENTS MAY DIFFER FROM THE DESCRIPTION. IF REMOVED BY WATER BUYER IS ENTITLED FOR CRAFT TO BE MOVED FROM CURRENT LOCATION TO CRANE FREE OF CHARGE, HOWEVER BUYER IS RESPONSIBLE FOR CRANE CHARGES IN ORDER FOR CRAFT TO BE LAUNCHED INTO WATER. CUSTOMER IS ALLOWED TO CONDUCT CUTTING/ BRAZING PROVIDED THAT HE FOLLOWS ALL SAFETY AND ENVIRONMENTAL REQUIREMENTS AS REQUIRED BY THE BASE SAFETY/ ENVIRONMENTAL OFFICER, IF DISASSEMBLED IN SECTIONS BUYER IS ENTITLED TO ONE SECTION LIFT ONLY, BUYER IS RESPONSIBLE FOR LIFTING OF REMAINING SECTIONS AT HIS OWN EXPENSE. BIDDING IS ON ONE CAUSEWAY ASSEMBLY. CRAFT IS LOCATED AT MARINE DETACHMENT BLOUNT ISLAND.
... read more

Has a Photo Bidding Restrictions Apply Tax Forms for this State Get a Quote
 1   $      FL,
Jacksonville

PREVIEW INFO...
LOADOUT INFO...
 03/03/2010  
5094
8910 
CAUSEWAY SECTION POWERED CONSISTS OF A WATERJET PROPULSION ASSY SPEC NO 2B047-S3116-20-037; CONNECTED TO A PONTOON STRUCTURE COMPRISED OF 22 P1 PONTOONS, 6 P1-M, ONE P8-F, ONE P8-CPONTOON, AND 2 P11 PONTOONS; ALL IAW NAVFAC SPEC NO 2B047-S3116-30-012; NOM LG 90FT, 22FT W, NOM HT 13 FT AT CONTROL STATION, AND 5'3" AT HULL, 205, 000 LBS WEIGHT; WATERJET PROPULSION ASSEMBLY INCLUDES 1 PORT PROP MODULE, 1 STBD PROP MODULE, AND 1 CENTER MODULE; DRAWING NO 61380921, SPEC NO 2B047-S3116-10-003 FACILITY WILL PROVIDE SERVICE OF MOVING CAUSEWAY OUT OF WATER IF NEED BE. FACILITY EXPECTS REASONABLE TIME OF 2 DAYS TO CUT CAUSEWAY IF REMOVING BY LAND. FACILITY WILL TRY TO PROVIDE LOADOUT SERVICE DEPENDING ON AVAILABILITY OF ACB-1 LOADING EQUIPMENT AND PERSONNEL. IF CUTTING CAUSEWAY BASE REQUIRES FIRE DEPARTMENT PERMIT, AND TO BE CERTIFIED TO CUT. BIDDING IS ON ONE CAUSEWAY SECTION, THE REST OF THIS DESCRIPTION IS WHAT ONE CAUSEWAY IS COMPRISED OF.
... read more

Has a Photo Bidding Restrictions Apply Tax Forms for this State Get a Quote
 1   $      CA,
Coronado

PREVIEW INFO...
LOADOUT INFO...
 03/03/2010  
 
< < Previous   |  |  Next > >  
 
Legend Go to Top 
Picture  Lot Has Pictures Hot  Featured Lot
DEMIL B/Q Bidding Restrictions Apply  DEMIL B/Q Bidding Restrictions Apply Hot  Exchange Sale Lot
FDA Bidding Restrictions  FDA Bidding Restrictions Apply Find out more about shipping  Shipping Information  
Tax Exemption Form for Lot  Tax Exemption Form for Lot      
EXPORT RESTRICTIONS ON ADPE & ELECTRONIC TEST EQUIPMENT:
All sales by Government Liquidation, LLC, are for domestic consumption, use or re-sale, and any intent to export items sold by Government Liquidation is at the Buyer’s sole risk, expense, and effort. Government Liquidation does not guarantee that any item sold can be exported or that the proper licenses can be obtained. Buyers wishing to export items should contact the appropriate U.S. Government agency regarding license requirements. Items may be subject to export restrictions imposed by applicable U.S. Laws and Regulations. You are responsible for compliance and should become aware of requirements and associated penalties for failure to comply.

You acknowledge and agree that certain goods, software, and technology may be subject to the export control laws and regulations of the United States, including but not limited to the Export Administration Regulations (EAR), the International Traffic in Arms Regulations, and regulations of the U.S. Department of Treasury, Office of Foreign Assets Control. You will comply with these laws and regulations.

You may not, without prior U.S. Government authorization, export, re-export, or transfer any goods, software, or technology, either directly or indirectly, to any country subject to a U.S. trade embargo or sanction or to any resident or national of these countries, or to any person, organization, or entity on any of the restricted parties lists maintained by the U.S. Departments of State, Treasury, Homeland Security or Commerce. In addition, any goods, software or technology may not be exported, re-exported, or transferred to any end-user engaged in activities, or for any end-use, directly or indirectly related to the design, development, production, use, or stockpiling of weapons of mass destruction, e.g. nuclear, chemical, or biological weapons, and the missile technology to deliver them.

We do not sell property to persons from the countries that are prohibited from receiving transfers of military equipment or technology. Please check with the appropriate government agency for a current list of prohibited countries. Buyers are advised that purchasing from us and then reselling or attempting to export to these countries is prohibited. The list of prohibited countries is subject to change at the discretion of the U.S. Government.

By clicking below, I acknowledge that I have read, understand and agree to be bound by these additional terms and conditions of sale. If I do not understand these terms and conditions, I certify that I will seek professional advice regarding the export of property before placing a bid on any items offered for sale.

When downloading forms, you will need to have Adobe Acrobat Reader installed on your computer. Please click the icon on the right to download Acrobat Reader from Adobe.com to your computer. Click to Download Adobe Acrobat Reader 

Surplus Home Search Surplus Surplus Locations About Us Help My Account
Customer Stories Surplus Hot Lots Event Calendar New Visitor? Contact Us Register
Heroes at Home Featured Events FSC Codes Shipping Live Chat Email Alerts
Bidder's Corner Past Bid Results RSS Feeds Terms and Conditions Privacy Policy

Copyright © 2001-2010 Government Liquidation, LLC., a Liquidity Services, Inc. marketplace. All rights reserved.